Logo Studenta

ICTNWK~2 - Carlos D

¡Estudia con miles de materiales!

Vista previa del material en texto

ICTNWK542– Install Operate and Troubleshoot medium enterprise routers.	
ICTNWK542 – Install Operate and Troubleshoot medium enterprise routers
Assessment
Contents
Unit information	3
training and assessment	6
TyPES of evidence	9
Contextualising assessment	9
assessment guide	10
Assessment cover sheet	12
written activity	13
Written Activity MARKING GUIDE	17
Practical Activity	19
Practical Activity	20
Scenario	20
Practical Activity MARKING GUIDE	22
Unit Assessment Pack (UAP) – Cover Sheet	25
Unit information
This Assessor Guide provides information to assess the unit ICTNWK542 – Design and implement a security system. This unit forms part of an accredited training course. Accreditation means that it must meet the required standards, and this includes ensuring all units of competency are assessed fairly, flexible and provide enough, authentic evidence to make a judgment and decision on competence. 
Practical sessions will involve using tools to configure router, switches and server.
The trainer is required to explain the software resources that are used in this unit. 
1) Packet Tracer
This software is required to be installed on a desktop or laptop. A demonstration would be required as how packet tracer works and how we can connect routers, switches and PC.
Link to download: https://www.netacad.com/courses/packet-tracer
Step 1: Create account 
Step 2: Login and chose your operating type 
Step 3: Download and run installation
Practical Activity 
CASE STUDY
Scenario
You are working as IT Specialist for AIBT Corporation, Sydney. Currently they 
Have a flat where they have their HR and the Finance department. As the number has grown significantly, They have acquired the new building and have placed the Sales and marketing department in the new building.
Currently AIBT is using the peer-to-peer network consists of eight IBM compatible PCs (Intel Pentium Duo Core 1.6MHz) running Windows XP and two Canon iR C3080 printers. You have noted that much of co-axial cabling runs across the floor and are serious OH & S issues. 
AIBT has fifteen IBM compatibles PCs (Intel Pentium Duo Core 1.6 MHz), one Hewlett Packard HP800N Laser and one Hewlett Packard HP4500DN color printer. The IBM PCs are running Windows 7 connected to peer-to-peer using coaxial cables.
You are recommended to connect the two sites so that IT will be easier for them to work. You have been asked to maintain the basic router security on both the routers. You are also recommended to install separate file server in the network was approved to allow effective sharing of information resources and increase security and overall productivity. It is expected that there will be heavy sharing of data between two offices. 
Background
In this activity, you are given a 192.168.72.0 /24 network address to use to design a VLSM addressing scheme. Based on a set of requirements, you will assign subnets and addressing, configure devices and verify connectivity.
Task
The scheme and simulations must be done in Packet Tracer, Save the file and send it as an attachment. And the scheme should be shown by taking images, and develop the following items:
· Step 1:     Determine the number of subnets needed.
· You will subnet the network address 192.168.72.0/24. The network has the following requirements:
·          SW-1 will be configured for the HR department which will require 7 host IP addresses 
·          SW-2 should be configured as the Finance department which will require 15 host IP addresses 
·          SW-3 should be configured for the marketing department will require 29 host IP addresses 
·          SW-4 should be configured as the sales department which will require 58 host IP addresses
1. Identify and analyse existing router performance against organisational requirements
2. Review the existing design documentation and determine alignment to organisational requirements
3. You are to design the network topology.
4. Design the VLSM Addressing Scheme 
5. Select and Contact vendors make documentation for the specifications such as the switches you will be using, the routers, the cables and complete the cost analysis 
6. Develop the plan with task priority and contingency arrangement for the installation of components with minimum disruptions to the client 
7. Get the client sign off for the preliminary concept including security and timings.
8. Determine the basic routing requirements and its operating parameters according to installation plan specifications by using questioning skills on clients 
9. Select required media, cables, ports, connectors and connect routers to network devices and hosts according to installation plan specifications
10. Access and use the router to set basic parameters and Upgrade the firmware on the router 
11. Configure the basic router security according to installation plan specifications 
12. Configure the static and default routes according to installation plan specifications
13. Configure and Verify the classless routing protocols such as EIGRP using variable length subnet mapping (VLSM) according to router specifications
14. Assign IP Addresses to Devices in LAN and WAN and Verify Connectivity
15. Save and backup the router configuration files according to installation plan specifications 
16. Troubleshoot the device configuration and network connectivity using basic program utilities
17. Document the common problems with the IP addressing 
18. Provide the brief report and seek and respond to feedback from required personnel
Unit Assessment Pack (UAP) – Cover Sheet 
Student and Trainer/Assessor Details
	Student ID
	
	Student name
	
	Contact number
	
	Email address
	
	Trainer/Assessor name 
	
Course and Unit Details 
	Course code
	
	Course name
	
	Unit code
	
	Unit name
	
Assessment Submission Method 
	☐ By hand to trainer/assessor
	☐ By email to trainer/assessor
	☐ Online submission via Learning Management System (LMS)
	☐ By Australia Post to RTO
	☐ Any other method _________________________________________________
 (Please mention here)
Student Declaration 
	· I certify that the work submitted for this assessment pack is my own. I have clearly referenced any sources used in my submission. I understand that a false declaration is a form of malpractice; 
· I have kept a copy of this assessment pack and all relevant notes, attachments, and reference material that I used in the production of the assessment pack;
· For the purposes of assessment, I give the trainer/assessor of this assessment the permission to: 
· Reproduce this assessment and provide a copy to another member of staff; and 
· Take steps to authenticate the assessment, including communicating a copy of this assessment to a checking service (which may retain a copy of the assessment on its database for future plagiarism checking).
Student signature: ________________________________ 
Date: ____/_____/______________
6

Otros materiales