What is the correct sequence of steps for the concrete slump test? A. Filling the mold with the 3rd and last layer B. Operator position C. Filling ...

What is the correct sequence of steps for the concrete slump test?
A. Filling the mold with the 3rd and last layer
B. Operator position
C. Filling the mold with the 1st layer
D. Filling the mold with the 2nd layer
E. Finishing and cleaning
F. Cone settling test
G. Mold lifting
H. Measurement of the slump
I. The test must be performed with at least 30 liters of concrete.
II. The first layer must be compacted with 25 rod hits.
III. The cone must be filled up to 2/3 of its volume.
IV. The test must be performed on a horizontal, firm, and vibration-free surface.
V. The entire filling and lifting operation should not take more than 3 minutes.
a) B, C, D, A, E, F, G, H
b) A, B, D, C, E, F, G, H
c) C, D, A, E, B, G, F, H
d) B, C, D, A, E, G, F, H

Esta pregunta también está en el material:

FICHA-ENSAYO-DEL-ASENTAMIENTO-DE-CONO
2 pag.

Materiais de Construção I Vicente Riva PalacioVicente Riva Palacio

Todavía no tenemos respuestas

¿Sabes cómo responder a esa pregunta?

¡Crea una cuenta y ayuda a otros compartiendo tus conocimientos!


✏️ Responder

FlechasNegritoItálicoSubrayadaTachadoCitaCódigoLista numeradaLista con viñetasSuscritoSobreDisminuir la sangríaAumentar la sangríaColor de fuenteColor de fondoAlineaciónLimpiarInsertar el linkImagenFórmula

Para escribir su respuesta aquí, Ingresar o Crear una cuenta

User badge image

Otros materiales