Compare the method by which the process control operation is changed in a relay-based system to the method used for a plc-based system.


a. In a relay-based system, rewiring the circuit is necessary to achieve the desired change. However, in a plc-based system, rewiring is not necessary.
b. In a relay-based system, rewiring the circuit is not necessary to achieve the desired change. However, in a plc-based system, rewiring is necessary.
c. The method used to change the process control operation is the same in both relay-based and plc-based systems.

Esta pregunta también está en el material:

Tarea 1 PLC
6 pag.

Controladores Lógicos Programáveis Instituto Tecnológico De La LagunaInstituto Tecnológico De La Laguna

Todavía no tenemos respuestas

¿Sabes cómo responder a esa pregunta?

¡Crea una cuenta y ayuda a otros compartiendo tus conocimientos!


✏️ Responder

FlechasNegritoItálicoSubrayadaTachadoCitaCódigoLista numeradaLista con viñetasSuscritoSobreDisminuir la sangríaAumentar la sangríaColor de fuenteColor de fondoAlineaciónLimpiarInsertar el linkImagenFórmula

Para escribir su respuesta aquí, Ingresar o Crear una cuenta

User badge image

Otros materiales

Materiales relacionados

7 pag.
Algebra de Boole

SIN SIGLA

User badge image

Diana Machado

10 pag.
Impresión 3D

SIN SIGLA

User badge image

Christian Gonzalez

9 pag.
Sensor Ultrasonico

SIN SIGLA

User badge image

Christian Gonzalez

9 pag.
Ultrasonido

SIN SIGLA

User badge image

Christian Gonzalez